Custom Plastic Injection Mold Vegetable Fruit Basket Mould Fruit Crate Mold

Still deciding? Get samples of $ !
Request Sample

Product Description

📋 Basic Specification
Model NO.
T19105
Surface Finish
Polishing
Mould Cavity
Single Cavity
Plastic Material
PP/PE/HDPE
Application
Commodity / Fruit Crate
Runner System
Cold/Hot Runner
Design Software
UG
Standard
DME
Cycle Time
50-60s
Mould Life
1,000,000 times
Lead Time
60 days
Heat Treatment
Nitriding
⚙️ Product Description

Professional Quality Plastic fruit Crate Mold solutions providing high-performance tooling for various specifications including 16, 20, and 24 bottles beer crate molds.

Key Features:
  • High quality steel with hardness certificates (P20/718/H13/S136)
  • Mould trial video documentation
  • Automatic operation design
  • Efficient cooling system designed by experts
Core & Cavity SteelP20/718/H13 /S136 ECT
Steel HardnessHRC35-38
Injection SystemPoint gate, hot runner system
Ejector SystemEjector plate
Quality AssuranceISO9001
🛡️ Quality Control Process

1. Mould Material Q/C: Steel checking (Hardness, flaw detection) and standard spare parts verification.

2. Mould Making Process Q/C: Design validation (2D/3D engineering), dimension checks after machining, and functional testing.

3. Shipping Verification: Final comprehensive check against customer requirements before dispatch.

🖼️ Product Gallery
Frequently Asked Questions
What materials are suitable for these crate molds?
The molds are specifically designed for HDPE, PP, and PE plastic materials, which are ideal for durable fruit and beer crates.
What is the expected lifespan of the mold?
With proper maintenance and use of high-quality steel like P20 or H13, the mold life is estimated at approximately 1,000,000 injection cycles.
What is the typical production cycle time?
The cycle time for these crate molds is generally between 50 to 60 seconds, depending on the specific product design and cooling efficiency.
Do you provide quality certification for the steel used?
Yes, we provide certificates for the mold core and cavity steel, ensuring the hardness and material quality meet international standards.
How is the quality of the mold controlled during manufacturing?
Quality control involves three main steps: material checking (hardness/flaw detection), process monitoring (machining size checks against 2D drawings), and rigorous final testing before shipment.
What is the standard lead time for mold tooling?
The standard lead time for tooling and manufacturing the crate mold is approximately 60 days from design approval.

Related Products